← Call to the Brave Read the opening · Call to the Brave

Chapter 1 . . S.S. Glenavon.

The ship was dying. Drowning.

She was dying because a high speed German assault boat had stormed out of the early gloom and struck without warning. Harnessing the power of three, 20-cylinder Mercedes engines, the boat reached a kill speed of thirty-four knots and fired two torpedoes. One slammed into the freighter’s vulnerable hull, one missed. A violent explosion ripped through the ship’s engine room, and having suffered such a catastrophic detonation, the old freighter began to lose her battle to survive.

It had been more than a decade since the late summer of 1930 when the S.S. Glenavon, then simply designated as Job No: JY-374/2a., had first had her keel laid down at the busy Jefferson Vickers shipyard on the north bank of the River Tyne near Gateshead. She launched in the September of 1930 and was completed at the fitting out berth as a general cargo vessel in late October. At 4,000 tons and with her holds brim full of iron ore, she could sustain a constant speed of ten-knots.

Now all these years later, on Wednesday, June the 23rd 1943, the Glenavon had taken passage with a convoy steaming east along England’s south coast, on course for the Thames Estuary. Unfortunately the normally reliable engine developed a low pressure problem which drastically reduced her speed. The advice from the convoy’s Commodore was to take advantage of nearby Dover harbour where repairs could be undertaken. Once inside the engineers began a thorough inspection of the ship’s mechanical complexities.

Finally, at 01.00 hours the next day, Thursday June 24th 1943, after eventually managing to locate and replace a short length of split quarter-inch pipework, the

From Call to the Brave by Graham J. Parry

Keep reading on Amazon UKAmazon US